LEED V5 SECTION EA PREREQUISITE 1: FUNDAMENTAL COMMISSIONING OF BUILDING ENERGY SYSTEMS

Intent:
Verify that the building’s energy related systems are installed, calibrated, and perform according to the owner’s project requirements, basis of design  and construction documents.

Requirements:
Designate an individual as the Commissioning Authority (CxA) to lead, review, and oversee the completion of the commissioning process activities.